Commercial Interior Fit-Out in Dubai
FANN carries out commercial interior fit-out in Dubai and Abu Dhabi, including partitions, ceilings, flooring, joinery, MEP coordination and finishes. Start with the unit's existing condition, intended use and building requirements so the proposal defines the actual work, responsibilities and handover checks.
Discuss your fit-out scopeStart with the unit, not a reference image
Identify the building, floor, approximate area and intended use. Say whether the unit is shell and core, fitted, occupied or being handed over by a previous tenant. Share current photographs, available drawings and a BOQ if one exists. Record what needs a site check rather than treating an old drawing as an as-built record.
Separate retained work from new work
Mark partitions, ceilings, flooring, doors, counters and equipment as retained, removed, relocated or new. Confirm protection of retained finishes and access to concealed services before closing walls or ceilings. A clear boundary between existing defects and new work helps the proposal identify exclusions and checks still outstanding.
Coordinate services before closing finishes
Place lighting, power, data, plumbing and any equipment interfaces against the agreed layout. Identify who checks existing capacity, prepares service drawings and supplies specialist equipment. Record access panels and maintenance needs alongside the joinery and ceiling details; a visual concept alone does not settle these interfaces.
Release joinery against a named revision
Agree reception counters, storage, wall panelling and other joinery against dimensions, materials, finishes and internal arrangements. Name the person who approves drawings and samples. FANN's workshop in Umm Al Quwain supports joinery production, but the production release still depends on the actual quantities, approved details and project programme.
Plan access, reviews and handover together
Share the landlord's fit-out guidance, approval status, delivery route and any restricted working periods. Identify who prepares and submits required documents, and separate fees from physical works. Agree site checks, snagging responsibilities, service testing and handover information before treating the preferred opening date as confirmed.
Define the quoted work
Partitions, ceilings, flooring, custom joinery and panelling, MEP coordination and final finishes. Name inclusions, exclusions and work supplied by others.
Completed commercial fit-outs in Dubai
Explore documented office, restaurant and healthcare interiors from FANN's project archive. Each project links to its own photographs and details, so you can review work relevant to your space rather than rely on concept images.
AB Prime Realty Office - Dubai, 2025 - 10,118 sq ft Adaline Restaurant - Dubai, 2024 - 6,000 sq ft Aspris Clinic - City Walk - Dubai, 2024 - 5,490 sq ftSend your drawings and scope
Email the unit details, current photographs, drawings or BOQ to business@fann.ae. Add the intended use, access constraints and preferred opening date.
Office and commercial fit-out company | Restaurant fit-out | Clinic fit-out | Villa renovation
Design concepts
These are design concepts created by FANN to show how we approach clinic, restaurant and retail interiors. They are concept visuals, not photos of completed projects. The actual design and any concept scope are agreed for your site; these images are not a free design offer or a promised turnaround.
Design Concept - designed by FANN
Clinic reception
Curved reception desk with fluted oak front, terrazzo floor, calm sage palette and a waiting lounge planned around patient flow.
Specialty coffee and restaurant
Ribbed walnut bar with stone top, open display shelving, banquette seating and warm pendant lighting.
Boutique retail
Travertine display table, backlit oak niches, brass rails and a curved fitting room in a warm neutral palette.
Frequently Asked Questions
What should we send for a commercial fit-out quotation?
Send the building and unit location, intended use, approximate floor area, current photographs and any drawings or BOQ. Identify retained finishes, equipment and areas being changed, plus your preferred opening date. Say which details need a site check so the quotation can name the work, exclusions and unresolved decisions.
How do shell-and-core and fitted units change the brief?
Describe the unit's current condition before agreeing the work. A shell-and-core unit and an occupied fitted unit can have different removal, protection and service-interface needs. Mark what stays, what changes and what requires inspection. Existing drawings help the review but do not replace checking the condition of the actual site.
What must be agreed before joinery production starts?
Agree dimensions, drawing revisions, materials, finishes and internal arrangements before releasing joinery production. Confirm samples, equipment interfaces and who signs off changes. FANN has a workshop in Umm Al Quwain; the approved details, quantities and project programme determine the production plan rather than a universal lead time for every fit-out.
How should work in an occupied commercial unit be planned?
State which areas must remain in use before the programme is agreed. Discuss separation of work areas, deliveries, noise restrictions and protection of retained finishes. Record any phased access or service interruptions that need coordination. Do not assume a live office, clinic or restaurant can be worked on as an empty unit.
Who handles building approvals and handover checks?
Agree responsibilities for the actual building, intended use and proposed changes. Identify who prepares and submits required drawings, arranges reviews and pays any fees. Set out service testing, snagging and handover information in the scope. A previous project or target opening date does not establish approval for a new unit.
What should a commercial fit-out quote include and exclude?
Use the drawings or BOQ to agree demolition, partitions, finishes, joinery and any MEP work, with quantities and responsibilities stated. Confirm landlord and authority submissions, fees, equipment supplied by others, access hours, waste removal and handover documents separately. A reference project does not establish what your site quote includes.
Can you confirm the opening date before a site review?
The schedule needs the site condition, agreed scope, access window and approval requirements. Share your target opening date, drawings and landlord requirements early. The project programme should identify dependencies and what must be approved before work starts; a target date is not an unconditional completion promise.
How much does an office or clinic fit-out cost in Dubai?
Cost depends on the space size, its current condition, the specification and the services required. Share the location, approximate area and drawings or BOQ if available for a project-specific quotation. Compare the agreed scope, inclusions and exclusions rather than applying a generic price per square foot.
Does FANN carry out clinic and healthcare fit-outs?
Yes. FANN carries out clinic and healthcare fit-outs. Review the clinic fit-out page and completed project references, then share your facility type, location and proposed work. The site scope and any approval requirements are checked for that project; a previous clinic reference does not establish approval for a new facility.
Do you also handle restaurant and retail interiors?
Yes. FANN works on commercial interiors including offices, retail, restaurants and clinics. The scope is agreed for the actual space. Describe the intended use, existing condition, floor area and work required so the quotation addresses your project rather than a different type of interior.
Can a fit-out design change after approval?
A requested change needs to be reviewed against the drawings, materials and project schedule. Confirm any effect on scope, price and timing before the changed work proceeds. Do not assume a change can be completed within a fixed number of days or without affecting other work.
Where is the fit-out team based?
FANN coordinates projects from its Dubai office in Al Barsha, with its workshop in Umm Al Quwain. Site work is planned for the location named in your brief. Use the fit-out brief link on this page to share your site and drawings.